O'Hara Engineering Services
  • Home
  • O'Hara Engineering Services
    • High Voltage Substations >
      • ESB Distribution & Transmission Network Upgrade
      • HIS Sub-Station
      • GIS Sub-Station (Indoor)
      • AIS Sub-Station
    • Medium Voltage Substations >
      • 20kV GIS Installation
      • 10kV AIS Installation
      • Medium Voltage - Generation Project
    • Building Services Installations >
      • Water Treatment
      • Office Space
      • Medical
    • Short Circuit, Protection & Discrimination Studies
    • Protection Systems
    • Cable Identification, Fault Location & Repair Services
  • Electrical Maintenance
    • Power Quality Analysis
    • Earth Testing
    • Transformer Testing & Maintenance
    • Oil Testing & Treatment
    • Switchgear, Circuit Breaker Testing and Timing
    • Primary & High Current Injection Testing
    • Secondary Injection Protection Relay Testing & Calibration
    • A.C & D.C. High Voltage Testing
    • Instrument Transformer Testing & Maintenance
    • Sulphur Hexafluoride Testing
    • Partial Discharge
    • Battery Testing
  • Recent Projects
  • Contact Us
    • Staff Log In
  • Careers



The Compact Outdoor Solution

O’HARA ENGINEERING SERVICES is one constructors with the vast  majority of its public contracts being carried out at 110kV. The transmission network sub-stations at 110kV in the Republic of Ireland are currently controlled by Eirgrid and under the remit of ESB Networks. These 110kV are built to provide services to small generation plants, heavy industry, commercial industry, transport and domestic users on the distribution service network.  The locations of these stations can be diverse from the mountain top for connection of large wind generation stations, where generation time is money to the city centre financial districts where security of the electrical supply is as important as the transactions that take place. 

Hybrid Outdoor switchgear is generally the solution used by distribution service operators in outer urban centres where sub-stations are required. The line/transformer bay arrangements are approximately 1/3 of the size of a standard outdoor Air Insulated sub-station.  This offers two main advantages over other types of station, reduced site size and thus reducing site purchase values and secondly the switchgear is outdoor negating the need for expensive and time consuming sub-station building construction.

110kV HIS Substation, Salthill, Co. Galway

Picture

Overview

Phase 1

  • Installation of all 38kV and Medium Volatge Switchgear.
  • Installation part of the 110kV Switchgear.
  • Installation house transformer.
  • Installation of all protection cabinets, AC/DC boards, batteries, chargers, SCS system and other equipment in the control room including the cabinets required for Phase 2.
  • Pre-commissioning.
  • Commissioning done by ESBI.
  • Energisation.

Phase 2

  • The existing MV and 38 kV connection onto new boards.
  • Existing 38kV building is demolished and bunds for transformers are built.
  • Retiring of existing substation and switchgear.
  • Install second part of the 110kV switchgear.
  • Install T141, T101 & T102.
  • Pre-commissioning.
  • Commissioning done by ESBI.
  • Energisation.