O'Hara Engineering Services
  • Home
  • O'Hara Engineering Services
    • High Voltage Substations >
      • ESB Distribution & Transmission Network Upgrade
      • HIS Sub-Station
      • GIS Sub-Station (Indoor)
      • AIS Sub-Station
    • Medium Voltage Substations >
      • 20kV GIS Installation
      • 10kV AIS Installation
      • Medium Voltage - Generation Project
    • Building Services Installations >
      • Water Treatment
      • Office Space
      • Medical
    • Short Circuit, Protection & Discrimination Studies
    • Protection Systems
    • Cable Identification, Fault Location & Repair Services
  • Electrical Maintenance
    • Power Quality Analysis
    • Earth Testing
    • Transformer Testing & Maintenance
    • Oil Testing & Treatment
    • Switchgear, Circuit Breaker Testing and Timing
    • Primary & High Current Injection Testing
    • Secondary Injection Protection Relay Testing & Calibration
    • A.C & D.C. High Voltage Testing
    • Instrument Transformer Testing & Maintenance
    • Sulphur Hexafluoride Testing
    • Partial Discharge
    • Battery Testing
  • Recent Projects
  • Contact Us
    • Staff Log In
  • Careers

Medium Voltage - Generation Project

EGIP - G10

This Project consisted of O'Hara Engineering Services.being the works Contractor CES Energy Ltd. in the construction of indoor 20kV Sub-Stations to allow 6MW of CHP Generation to be installed on the network of Japan Tabacco International in Ballymena, Northern Ireland
 
The installation consisted of installing new 11kV Cubicles on the existing MV System, A new NER to be installed on the companies 33kV/11kV Transformers and the complete design supply and installation of a new G59 Protection system
Picture

Supplied, Installed & Commissioned

Unit 16,
Western Parkway Business Centre,
Ballymount Road Lower,
Walkinstown,
Dublin 12,
D12 W8HE
Ireland.

Phone: 01-4564876
Email: reception@ohara.ie