Water Treatment Plant in Ballymore Eustace
This Project consisted of the conversion of an existing high-tech ward facility into four Consultant Retinal Suites, an E.E.G. Suite, including the new installation of a Nurses Station/Reception area. This location is to provide the hospital with accomodation for its consultant whilst its ever expanding Cadiology department is being extended. The Project was carried out in conjuntion with the design team of Curley Smith Design and Michael Collins Architects.
The entire installation including the supply and installation of 10kV Site Wide Networks including 6no. Sub-stations c/w closed coupled Electrical Panels. This project included the co-ordination for the installation 3no. Generators supplied under a separate contract. Re-Design of the M.V. Cabling Network in conjunction with the Electrical consulting engineer RPS